Storm or tree strike
Wind and falling branches can pull an overhead line, damage insulation or distort its attachment. Treat low, fallen or displaced lines as live, stay clear and report the hazard before arranging property repairs.

Electrical Supply Routes
The electrical supply route to a property may arrive overhead from a street pole or underground from a pit, pillar or other approved network connection. Renovations, storm damage, ageing conductors and changed loads can all lead to that route being repaired, relocated or replaced.
Request a Quote
Tell us about the electrical work you are planning and the team will be in touch to discuss the next step.
01 / When You Need This
The correct remedy depends on whether the issue concerns the network service, privately owned mains, the attachment or the customer installation.
Wind and falling branches can pull an overhead line, damage insulation or distort its attachment. Treat low, fallen or displaced lines as live, stay clear and report the hazard before arranging property repairs.
A line that appears lower than before, rubs vegetation or shows damaged insulation needs assessment. Do not use a ladder or pole to measure it. Clearances and ownership are checked by the appropriate parties.
A changed roofline, scaffold, balcony, pool or driveway can conflict with the existing route. Relocation may require a new attachment, new customer mains and a coordinated transfer of the network service.
Owners may prefer underground supply for a renovation, changed landscape or reduced aerial conflict. Feasibility depends on the local network, point of connection, trench route and approval requirements.
Cable condition and capacity can become relevant during switchboard work, electrification or a three-phase proposal. The assessment distinguishes customer-owned consumer mains from network service conductors.
A new supply arrangement may be needed for demolition and rebuild, a granny flat, subdivision or separate metering. Early planning prevents the service route conflicting with drainage, structures or finished landscaping.
02 / What's Involved
Route design considers electrical requirements alongside the physical site and the future use of the property.
The street connection, service line, point of attachment, meter position and customer mains are identified. This determines where the accredited partner's scope ends and Stewart's installation-side scope begins.
Span, support, conductor condition, attachment hardware and clearances are reviewed against the proposed building and landscape. Vegetation management is coordinated without working near live conductors.
The route is checked for other services, roots, rock, drainage, retaining walls, public verges and finished surfaces. Conduit size, bends and access points follow the approved design.
Stewart scopes customer-side cable, enclosure entries, main switch, protection, earthing and board capacity. Related upgrades are not assumed until inspection confirms what is required.
The accredited partner confirms connection requirements, while retailer or metering-provider bookings are identified where relevant. These are separate dependencies even when attendance is coordinated.
Trenching, boring, traffic control, concrete cutting and reinstatement are listed separately. The quote states who opens and restores each surface and whether inspections are required before backfilling.
03 / The Process
The work is arranged around an approved route and a safe transfer from the old supply to the new one.
Responsibility: Stewart Electrical Group
We inspect the switchboard, meter, attachment, accessible cable and site obstacles, then review plans for additions, pools, landscaping or demolition.
Responsibility: Stewart Electrical Group
Cable routes, conduit, trenching, board changes and building interfaces are documented. Quotes identify exclusions such as public-domain excavation or specialist tree work.
Responsibility: Accredited Level 2 partner
The partner checks the distributor process, approved point of connection and service method, then supports or lodges required applications and notifications. The written scope confirms which party prepares and lodges each required application or notification before work is booked.
Responsibility: Stewart Electrical Group and civil contractor
Approved conduit, supports, customer mains and switchboard equipment are installed to the required stage. Underground work remains visible for any inspection required before backfill.
Responsibility: Accredited Level 2 partner
The partner isolates and completes authorised network-side terminations, service-line alterations or connection work, then tests its scope before energisation.
Responsibility: Stewart Electrical Group and accredited partner
Stewart tests customer-side work and provides required CCEW records; the partner completes service notifications. The site is restored according to the accepted civil scope.
04 / Safety & Compliance
The NSW Service and Installation Rules and the relevant distributor's standards govern service arrangements. Customer-side installation work also follows applicable requirements of AS/NZS 3000.
Network-side service-line work is performed by an appropriately accredited and network-authorised Level 2 partner. Stewart coordinates that scope but does not perform or certify it.
Stewart tests included consumer mains, switchboard and customer wiring and provides a CCEW where required. The partner completes service-work notification within its scope. The accepted scope records the applicable documents and the handover sequence for each party.
Fallen or damaged lines must be treated as live. Stay at least eight metres away, contact the network emergency line and call 000 if life is at risk.
05 / Local Conditions
Established Shire streets can combine overhead street networks with private underground sections added during renovation. Tracing where the transition occurs is important before new landscaping or driveway work begins.
Sloping and rocky blocks around Gymea Bay and parts of Sutherland can make trenching and conduit bends more involved. In coastal suburbs, salt exposure and storms can affect overhead hardware and exterior enclosures.
Dense St George sites often have narrow access, shared driveways and closely spaced buildings. A route that looks direct on a plan may conflict with sewer, stormwater, gas or neighbouring access when marked on site.
Our Kirrawee, Sutherland, Gymea, Miranda, Caringbah, Cronulla, Sylvania and Taren Point pages contain further local context.
What Our Clients Say
Sean W.
"Darcy and Blake are professional in every sense. We've used them now for two rounds of renovation works. Both times the works were completed to a high standard, communication was clear throughout, and pricing was fair and transparent."
Johanna F.
"Darcy and the team at Stewart Electrical were brilliant to deal with from start to finish. Friendly, professional and found the perfect solution within my budget. Communication confirming the job and timing on the day was great."
Albert P.
"It is great dealing with Darcy and Blake, both projects were delivered on time, budget and with great feedback from our clients. We are looking forward to working with you in future."
Laura W.
"Darcy is quick to respond, manages expectations with a time window of arrival and keeps to it, gets the job done quickly. Was professional dealing with a very fragile light fitting. Friendly, good to chat to."
Andrea L.
"I've worked with Darcy and his team across three properties now. Their professionalism, communication and knowledge is outstanding, honestly rare when dealing with trades. They actually care about the work they do. I won't use any other electrician."
Tahira K.
"Fantastic experience with the ceiling fan installation. Smooth, efficient service at a reasonable price, completed quickly without compromising quality. Friendly, helpful staff who answered all my questions. Highly recommend!"
Maryanne P.
"Very impressed, prompt replies, excellent communication and a very high standard of work. The team are professional, friendly and easy to deal with. Highly recommend!"
Amanda W.
"Excellent communication, prompt to the minute, and lovely to deal with. Darcy fixed our tricky issue with creative thinking and we were very satisfied with the result. Fantastic electrician, highly recommend!"
Shanel H.
"Darcy was the only electrician who took the time to contact me when I lost power. He swiftly identified and fixed the issue, with recommendations to prevent it reoccurring. Professional, punctual, and quoted before starting. Happy to give SEG our repeat business."
03 / Recent Projects

Power Point Installation · Mascot
Complete lighting installation, power supply and outlet setup, data cabling and switchboard upgrade.
View service
Commercial Electrical
Electrical upgrades across hotel rooms, shared common areas and the gym in a live hospitality environment.
View service
Lighting Installation · Balmain
Electrical design and construction for a bathhouse, including lighting, heating systems and an infrastructure upgrade.
View service04 / Popular Services
Residential, commercial and specialised electrical work, planned around the property and completed with close attention to safety and finish.
Modern circuit protection and switchboard work.
→02Methodical diagnosis for electrical faults and outages.
→03Indoor, outdoor and architectural lighting work.
→04New outlets, circuits and practical power upgrades.
→05Smoke alarm installation and compliance work.
→06Full and partial rewiring for established homes.
→Related Guides

05 / Our Standards
Careful installation, thorough testing and a considered finish.
The scope and next steps are explained in plain language.
A clear written quote sets out the agreed work before it begins.
Work areas are treated carefully and left clean at handover.
06 / Local Service Areas
07 / Frequently Asked Questions
Stewart completes the included customer-side mains and switchboard work. The network-side service connection is completed by an accredited Level 2 partner coordinated for the project.
No. The distributor must permit the proposed method and connection point. Site access, public land, trenching and cost also affect feasibility.
The accepted quote identifies whether Stewart coordinates a civil contractor or the owner or builder provides the trench. The approved conduit and inspection sequence must be followed before backfilling.
Keep clear and contact the network if the line is low, damaged or presents a hazard. Do not touch it, move it or trim nearby branches yourself.
It may. The board, main switch, protection, earthing and cable capacity are assessed together. The quote separates necessary board work from optional improvements.
The planned outage depends on the transfer method and readiness of both scopes. The expected outage is confirmed after the transfer method, approvals and readiness of both work scopes are known. Critical equipment and access needs should be discussed before scheduling.
Request a Quote
Arrange a site assessment so the customer-side route, network requirements and accredited partner work can be scoped in the correct order.